Home » Products »

Motor Parts Stator Rotor

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2019-10-02 11:13

  • Browse the number:

    307

Send an inquiries
Company Profile
Wuxi Huazai Silicon Steel Stamping Co., Ltd
Contactaixin:

hzxgcyj(Mr.)  

Email:

telephone:

phone:

Arrea:

Jiangsu

Address:

No 3,huihe road,qianzhou town, Huishan Economic Development Zone,wuxi,jiangsu

Website:

http://www.wxhuazai.com/ http://hzxgcyj.sh-hosanna.com/

Product details

Description:


We specialize in the production of motor parts stator rotor and have always enjoyed a good reputation with excellent product quality. The motor parts stator rotor has a simple structure and is convenient to use.


Specifications:


Material

silicon steel sheet

Stacking Technology

welding technology  /argon arc welding/

checkout

100% of all inspection 100%

OD  

customized

ID

customized

Slot

customized

Tolerence

±0.05

sales method

factory direct sale



Application 

New energy automobile motor ,electric motor vehicle, motor generator, crane air conditioning compressor sewing machine power tools.

Water pump, Industrial motor, Fan motor, Generator, Compressor and Car..

Packaging Details

Standard export seaworthy packing or According to your requirement


Advantage:


The permanent magnet is located on the outer rotor that rotates around the inner stator. Compared with the internal rotor motor, this structure has a short design and a small torque inertia of the rotor, and the output torque ripple is small.


Our service:


1. Our engineers will carefully check your specific drawings.

2. If there are no problems, you will be provided with a quote within 2-3 days, otherwise, feedback will be sent immediately to confirm the required information.

3. If you are developing a new project, our engineers will provide some professional advice based on your requirements.

4. The engineer will provide the mold solution through 3D drawing within 3-5 working days, and complete the mold within 15-25 days after confirmation.

http://www.wxhuazai.com/